Hoshin Kanri

Cascade map

Cascade map is licensed CC BY 4.0. Attribution: Katafacts (katafacts.com).

Customise with AISkill file ↓

1 · What it is

What it is

A cascade map records the one hand-off Hoshin Kanri depends on and nothing else in this catalogue tracks: whether a parent plan's annual objectives actually became real, owned work at the level below. An X-Matrix sets one level's plan; catchball is the negotiation that produces it; a cascade map is the separate, later question of what happened to each objective after that — did a real unit take it on, and is that commitment real or just a name on a slide. It is not a KPI tree: a KPI tree breaks one goal into the driver metrics that move it, inside a single function; a cascade map tracks which unit owns which objective, across multiple units, and says nothing about the metrics that prove any of them are moving.

2 · When to use it

When to use it — and when not to

Use it when

  • You have a real X-Matrix (or a prior year's cascade) whose annual objectives need to become owned work at the level below it.
  • You want an honest record of which objectives have a real, committed owner and which are still just proposed — not a plan that looks complete because every cell got filled in.
  • You're checking whether the load is actually balanced across units, not quietly concentrated on the same team that always says yes.

Not when

  • You don't have a parent plan yet — build the X-Matrix first; a cascade map has nothing to cascade from without one.
  • You want a single function's own goal-to-metric breakdown — that's a KPI tree, not a cascade map. A cascade map is about which unit owns which objective; a KPI tree is what that unit tracks once it does.
  • You're tempted to mark a link 'committed' just to make coverage look complete — an objective assigned on paper with no real agreement behind it is exactly the failure catchball itself exists to prevent, one level up.

3 · How to fill it in

How to fill it in

Parent plan objectives
Name the parent X-Matrix and describe its real annual objectives — a first-pass list gets drafted from that, for you to correct against the plan's actual objectives and targets.
Cascade units
The teams, divisions, or sites this plan needs to cascade to — drafted from your description.
Cascade links
Only enter a link where a unit has actually proposed or committed to carrying a parent objective forward as its own, with a local objective that's genuinely more specific than the parent one — a real hand-off, never the parent text copied down.
Coverage
Computed for you from your parent objectives, units, and links — nothing to enter here.
Narrative
Drafted from the cascade actually built.
Next steps
What will you do about a dark objective or an unloaded unit, ranked by impact and effort, owned and dated.

4 · What good looks like

What good looks like

The example below cascades Northwind Fabrication's own FY2027 X-Matrix (the Hoshin Kanri worked example) to its shop-floor teams: two of the three annual objectives have a real, committed owner — the CNC Shop Floor and Scheduling teams — while the late-shipment objective is still only proposed to Quality, honestly left uncommitted rather than marked done to round the numbers up.

Same example, as a downloadable xlsx workbook.

Download .xlsx

Cascade map · Northwind Fabrication — FY2027 Hoshin Kanri

Northwind Fabrication — FY2027 cascade map

Oksana Petrova, Plant Manager · 2027-01-26

Team: Priya Nair, Ops Manager · Sponsor: Board of Directors

Parent plan objectives

  • Reduce average order lead time to 12 days

    12-day average by Q4 FY2027

    1 unit(s) committed

  • Cut the late-shipment rate from 14% to 6%

    6% late-shipment rate by Q4 FY2027

    Dark

    0 unit(s) committed

  • Launch a repeat-customer priority queue

    Live by Q2 FY2027; 20% of repeat orders routed through it by Q4

    1 unit(s) committed

Cascade units

  • CNC Shop Floor

    Team · 1 objective(s) owned

  • Scheduling Team

    Team · 1 objective(s) owned

  • Quality Team

    Team · 0 objective(s) owned

Cascade links

  • CNC Shop FloorComplete second-shift hiring and training, and hit a 12-day average lead time on CNC-routed orders by Q4 (Marcus Webb, Shop Supervisor, committed)
  • Scheduling TeamBuild and launch the repeat-customer priority queue in the scheduling system by Q2, with 20% of repeat orders routed through it by Q4 (Dana Ruiz, Scheduling Lead, committed)
  • Quality TeamCut the late-shipment rate to 6% — proposed at the Q1 cascade review, owner not yet named (TBD, proposed)

Coverage

Parent objectives

3

Cascaded

2

Cascade coverage

66.7%

Dark objectives

1

Units

3

CNC Shop Floor

1 owned

Scheduling Team

1 owned

Quality Team

0 owned

Dark objectives

Cut the late-shipment rate from 14% to 6%

Narrative

Two of the plan's three annual objectives have a real, committed owner at the team level: the CNC Shop Floor has taken on the lead-time objective, and Scheduling has taken on the priority-queue launch. The late-shipment objective is still only proposed to Quality — raised at the Q1 cascade review, but nobody has actually agreed to own it yet. Cascade coverage sits at 66.7% on that basis, not 100%, because a proposal isn't the same thing as a commitment.

Next steps

  • Get a named owner and a committed local objective from Quality for the late-shipment target before the Q2 business review.

    Cut the late-shipment rate from 14% to 6% — proposed to Quality, not yet committed · Impact: high · Effort: low · Oksana Petrova · 2027-02-15

  • Confirm the CNC Shop Floor's second-shift hiring is actually on track to support the 12-day target, not just committed on paper.

    CNC Shop Floor — committed to the lead-time objective · Impact: medium · Effort: low · Priya Nair · 2027-02-28

5 · Common mistakes

Common mistakes

  • Marking a link 'committed' when it's really still just an assignment on paper.

    A unit that was told to own an objective, but never actually agreed to it, hasn't really taken it on — the whole point of tracking 'proposed' separately is catching this before the year ends and nobody delivered.

  • Copying the parent objective's text down as the local objective instead of making it genuinely more specific.

    A cascade that doesn't get more specific at each level isn't actually cascading — it's relabeling. The local objective should say exactly what this unit is going to do, not restate the parent's aspiration.

  • Building the cascade once at the start of the year and never updating it as proposals turn into commitments or quietly fall through.

    Same living-document discipline as the X-Matrix itself — a cascade map that was accurate in January and never touched again is stale by the first business review.

6 · What it connects to

What it connects to

upstream

  • Hoshin Kanri — X-Matrix

    The parent plan this cascades from — a cascade map has nothing to track without a real X-Matrix's annual objectives behind it.

downstream

  • KPI tree

    Once a unit actually commits to a local objective here, a KPI tree is often what that unit builds next to track the driver metrics that move it week to week — the cascade map records the hand-off, the KPI tree is what happens after.

  • A3 problem solving

    When a committed local objective isn't moving, an A3 is the right tool to find out why — the cascade map shows who owns it, the A3 closes the specific gap.

7 · Where AI helps

Where AI helps

Judgement — stays yours

  • Deciding whether a unit has actually committed to an objective or merely been assigned it
  • Deciding which dark objective or unloaded unit to chase down first

Analysis — AI helps

  • Drafting a first-pass parent-objective and unit list from a description of the parent plan
  • Drafting the narrative from the cascade actually built

Drudgery — automated

  • Computing cascade coverage and per-unit load
  • Flagging dark objectives — parent objectives with zero committed links
  • Exporting to xlsx in the house format