Visual management
Go-see protocol
Go-see protocol is licensed CC BY 4.0. Attribution: Katafacts (katafacts.com).
Customise with AISkill file ↓1 · What it is
What it is
A go-see protocol is a gemba walk with real technique behind it — the work instruction shape (major step, key point, reason) applied to observation instead of a task. Describe the walk roughly, and real steps get drafted: what to check, how to observe without distorting what you see, and why each technique matters.
2 · When to use it
When to use it — and when not to
Use it when
- You want to verify that a visual board or training matrix reflects what's actually happening, not just what's documented.
- A new leader or team member needs a real, repeatable way to observe the work, not just wander over and watch.
- You want to catch drift between the plan and reality before it becomes a real problem.
Not when
- The observation is genuinely a one-off, not a repeatable practice — a work instruction adds structure a single visit doesn't need.
- You'd be observing to catch someone doing something wrong rather than to understand the real work — that's not what a go-see walk is for.
3 · How to fill it in
How to fill it in
- Purpose
- What does this walk verify, and what would go unnoticed without it?
- Steps, key points & reasons
- Drafted from your description of the walk — major steps, each with zero or more key points and, for every key point, the reason it matters.
- Narrative
- Drafted from the steps actually built.
4 · What good looks like
What good looks like
The example below is a go-see walk that checks the renewal-risk queue's visual board and ILUO matrix against what's actually happening on the floor — three of four steps have a real key point, and the fourth is honestly left flagged rather than padded.
Same example, as a downloadable xlsx workbook.
Download .xlsxWork instruction
Go-see walk — renewal-risk queue
Support — renewal-risk queue
Priya Nair · 2026-10-09
Purpose
Verifies that what the visual board and training matrix claim is actually true on the floor — catches drift between what's documented and what's really happening before it becomes a real problem.
Steps, key points & reasons
4 steps · 3 key points
1. Stand at the point of work without interrupting
- Watch a full ticket-handling cycle before asking any questions — Interrupting early means you see the explanation, not the actual work.
2. Compare what the board shows against what's actually happening
- Check the KPI tree summary's numbers against the live dashboard, not from memory — A board that's a day stale looks fine at a glance but hides real drift.
3. Ask the person doing the work what's slowing them down
- Ask open questions, not leading ones — A leading question gets confirmation, not a real answer.
4. Note any gap between the ILUO matrix and who's actually handling each ticketNo key point yet
Narrative
Three of four steps have a real key point grounding the technique in a specific reason. The fourth, noting gaps between the ILUO matrix and actual handling, is still just an action with no key point yet — worth adding once there's a clearer sense of what to specifically look for.
5 · Common mistakes
Common mistakes
Asking questions before watching a full work cycle.
An early question changes what you see — you get the explanation, not the real work.
Comparing the board against memory instead of the live data.
A board that's a day stale still looks fine at a glance — checking against live numbers is what actually catches drift.
6 · What it connects to
What it connects to
upstream
Visual board design guide
A go-see walk exists to verify the board's own claims against reality.
ILUO training matrix
Checking who's actually handling the work against who the matrix says is trained is a natural go-see step.
downstream
7 · Where AI helps
Where AI helps
Judgement — stays yours
- Deciding whether a step genuinely needs a key point or is simple enough not to
- Deciding what a drifted observation actually means for the team
Analysis — AI helps
- Drafting major steps, key points, and reasons from a description of the walk
- Drafting the narrative from the steps actually built
Drudgery — automated
- Counting steps and key points
- Identifying which steps still have no key point
- Exporting to xlsx in the house format
9 · Rate this kata