1 · What it is

What it is

A work instruction written once and never checked again tends to drift from what people actually do. This audit is the sustainment audit's exact shape, applied to a work instruction: restate what it was supposed to ensure, get a checklist of specific practices to verify, and see honestly which are still holding weeks or months later.

2 · When to use it

When to use it — and when not to

Use it when

  • A work instruction has been in place long enough to check whether it's actually still followed, not just written.
  • You want to catch instruction drift — the real practice diverging from the documented one — before it becomes the norm.
  • You want to close a gap the instruction itself flagged when it was first built (a missing key point, an unclear step).

Not when

  • The instruction was just written — give it real time to settle before auditing it.

3 · How to fill it in

How to fill it in

Original objective
What was the work instruction supposed to ensure?
Sustainment checks
Drafted from what the instruction was supposed to change — verify what's actually still holding.
Narrative
Drafted from the checklist actually built.

4 · What good looks like

What good looks like

The example below audits the tier-3 work instruction for triaging renewal-risk tickets, fifty-one days after it was written — including whether the step it originally flagged with no key point still has that gap.

Same example, as a downloadable xlsx workbook.

Download .xlsx

Sustainment audit

60-day audit — renewal-risk triage work instruction

Auditing: Triage a renewal-risk support ticket (work instruction)

Marcus Lee · 2026-11-10 · 51 days since event

Original objective

Ensure every renewal-risk ticket gets confirmed, routed, and responded to within SLA, using the CRM health score rather than a stale tag.

Sustainment checks

2 of 4 holding (50%)

  • New hires are trained against this instruction, not just told about it verbally
  • The instruction's key points still match the real triage routing rule
  • The instruction is stored where the team can actually find it during a live ticket
  • The 'log the resolution path' step still has no key point, as originally flagged

At risk: The instruction is stored where the team can actually find it during a live ticket, The 'log the resolution path' step still has no key point, as originally flagged

Narrative

Half of the practices are still holding — training against the real instruction and keeping its key points current with the actual routing rule. The instruction isn't easy to find during a live ticket, and the missing key point on logging the resolution path — flagged when the instruction was first built — still hasn't been added. Both are quick fixes worth prioritizing.

5 · Common mistakes

Common mistakes

  • Auditing an instruction that was never actually rolled out.

    A sustainment audit checks whether real practice has drifted from a real standard — there's nothing to check if the standard was never actually used.

  • Marking a practice as holding without actually verifying it on the floor.

    The audit only has value if it reflects reality, not a hopeful assumption.

6 · What it connects to

What it connects to

upstream

  • Work instruction

    The instruction's own steps and key points are exactly what this audit checks against reality.

downstream

    7 · Where AI helps

    Where AI helps

    Judgement — stays yours

    • Deciding how much time to give an instruction before auditing it
    • Deciding what to do about a practice that's flagged at risk

    Analysis — AI helps

    • Drafting specific, verifiable checks from a description of what the instruction was supposed to ensure
    • Drafting the narrative from the checklist actually built

    Drudgery — automated

    • Tallying how many practices are still holding
    • Identifying which practices are at risk
    • Exporting to xlsx in the house format